ci-accelerator/ci-accelerator
Builds/#3028917190/build-image

build-image

From cache
“e2e: upgrade from 0.5.1; its image among the released ones”1173303e on post-0.5.1node mdkjr
From cache
Nothing was rebuilt: 18 steps came from cache.
When they last ran, these steps took 51 s together.
5.3 s 0 of 21 steps ran
Job logthe end of it, read from GitLab when you open this

Read from GitLab when you ask, nothing before.

What changed since the previous build

the previous build, pipeline #3028796802 · compare side by side
Commit
efdd8449 → 1173303e e2e: upgrade from 0.5.1; its image among the released ones

Steps

LineStepResultTime
base imagegolang:1.27.3-trixiealready on this node · line 50.0 s
base imagegcr.io/distroless/static-debian13:nonrootalready on this node · line 300.0 s
base imagegcr.io/distroless/static-debian13:nonrootalready on this node · line 300.0 s
Detailsnode, job, context, trace, record
Build node
ci-accelerator-buildkit-mdkjr
Routed by
the build router: the job's own node, ubuntu-8gb-hel1-2, whose cache holds the project's layers
GitLab job
build-image · 17749979360 · 16 s in all, 5.3 s of it building
Before the build
the job's pod starting: scheduled, images pulled 2.9 s · the runner attaching to the pod, the checkout and the job's script up to the build 3.7 s (the pod's times are whole seconds, as Kubernetes records them)
Waited for a runner
2.5 s
Runner
ci-accelerator box (Hetzner, the project's own builds)
Build context sent
2.1 MiB
Steps not run here took, when they last ran
51 s
Started
4 Nov 20:16:35 UTC
Pushed
registry.gitlab.com/ci-accelerator/ci-accelerator:1173303e
Trace id
019931960000b4899bc6000421fb30e0
Record
2jsogdqlrrkuz3m8eild2vowf
API
GET /api/v1/builds?limit=50 (this build is id 145)