ci-accelerator/ci-accelerator

go-vet

From cache
“after 0.6.0: the upgrade test starts from it”1f05cab1 on after/v0.6.0target vetnode mdkjr
From cache
Nothing was rebuilt: 6 steps came from cache.
When they last ran, these steps took 13 s together.
0.1 s 0 of 7 steps ran
Job logthe end of it, read from GitLab when you open this

Read from GitLab when you ask, nothing before.

What changed since the previous build

the previous build, pipeline #3068079885 · compare side by side
Commit
e923d936 → 1f05cab1 after 0.6.0: the upgrade test starts from it

Steps

LineStepResultTime
base imagegolang:1.27.3-trixiealready on this node · line 60.0 s
Detailsnode, job, context, trace, record
Build node
ci-accelerator-buildkit-mdkjr
Routed by
the build router: the job's own node, ubuntu-8gb-hel1-2, whose cache holds the project's layers
GitLab job
go-vet · 18031348090 · 9.8 s in all, 0.1 s of it building
Before the build
the runner preparing the job's pod 0.6 s · the job's pod starting: scheduled, images pulled 2.0 s · the runner attaching to the pod, the checkout and the job's script up to the build 3.8 s (the pod's times are whole seconds, as Kubernetes records them)
Waited for a runner
4.8 s
Runner
ci-accelerator box (Hetzner, the project's own builds)
Build context sent
7.8 MiB
Steps not run here took, when they last ran
13 s
Started
14 Nov 11:18:22 UTC
Trace id
019931960000b6e025bb000432c0897a
Record
oj2end525szb7d0is34rwndjd
API
GET /api/v1/builds?limit=50 (this build is id 210)