ci-accelerator/ci-accelerator
Pipelines/#3046669626

gitlab-runner 19.5.1: the trivy entries name it, changelog and upgrade note

Passed
maina0bfc99e9 Nov 19:29 UTC

All 3 images came from the cache. They were ready 7.3 s after the first build started.

3 jobs in 21 swaiting for a runner: usually 4.5 s, longest 5.9 s (go-vet)

Timeline

every job of the pipeline · build-image ended last
Pipeline › job › stage › step72 rows
0s5s10s15s20s
gitlab-runner 19.5.1: the trivy entries name it, changelog and upgrade note
21 s · 3 jobs
Runner & checkoutSend contextExport & pushBase imageJob without an image buildWaiting for a runnerBuiltFrom cacheWaiting for another job