ci-accelerator/ci-accelerator
Pipelines/#3047008427

docs: the upgrade note's recount covers the collector's window; speed-ups are a card, not a section; testing.md lists the new checks

Failed
v0.5.2-work1888975c9 Nov 21:13 UTC

All 3 images were rebuilt: 2 because of the change, 1 failed. Ready 55 s after the first build started.

3 jobs in 1 min 9 swaiting for a runner: usually 4.2 s, longest 5.4 s (go-vet)

Timeline

every job of the pipeline · go-test ended last
Pipeline › job › stage › step75 rows
0:000:100:200:300:400:501:001:101:20
docs: the upgrade note's recount covers the collector's window; speed-ups are a card, not a section; testing.md lists the new checks
1 min 9 s · 3 jobs
Runner & checkoutSend contextExport & pushBase imageJob without an image buildWaiting for a runnerBuiltFrom cacheWaiting for another job

Rebuilt

the first rebuilt step and why