ci-accelerator/ci-accelerator
Pipelines/#3047034891

reasons: test a COPY --link merge on an unchanged layer over a changed stage

Failed
v0.5.2-work6ec73aaa9 Nov 21:21 UTC

All 3 images were rebuilt: 2 because of the change, 1 failed. Ready 34 s after the first build started.

3 jobs in 46 swaiting for a runner: usually 1.9 s, longest 2.9 s (go-vet)

Timeline

every job of the pipeline · go-test ended last
Pipeline › job › stage › step73 rows
0s10s20s30s40s50s
reasons: test a COPY --link merge on an unchanged layer over a changed stage
46 s · 3 jobs
Runner & checkoutSend contextExport & pushBase imageJob without an image buildWaiting for a runnerBuiltFrom cacheWaiting for another job

Rebuilt

the first rebuilt step and why