ci-accelerator/ci-accelerator
Pipelines/#3047208319

showcase: the go test build sees the API contract

Passed
maine872e2ce9 Nov 22:17 UTC

All 3 images came from the cache. They were ready 6.8 s after the first build started.

3 jobs in 19 swaiting for a runner: usually 2.3 s, longest 2.9 s (go-vet)

Timeline

every job of the pipeline · build-image ended last
Pipeline › job › stage › step74 rows
0s5s10s15s20s
showcase: the go test build sees the API contract
19 s · 3 jobs
Runner & checkoutSend contextExport & pushBase imageJob without an image buildWaiting for a runnerBuiltFrom cacheWaiting for another job