ci-accelerator/ci-accelerator
Pipelines/#3080049226

renovate: list the two pins the audit annotated

Passed
fix/project-audit4880e35717 Nov 16:39 UTC

All 3 images came from the cache. They were ready 5.6 s after the first build started.

3 jobs in 20 swaiting for a runner: usually 4.0 s, longest 5.2 s (go-vet)

Timeline

every job of the pipeline · build-image ended last
Pipeline › job › stage › step74 rows
0s5s10s15s20s
renovate: list the two pins the audit annotated
20 s · 3 jobs
Runner & checkoutSend contextExport & pushBase imageJob without an image buildWaiting for a runnerBuiltFrom cacheWaiting for another job