ci-accelerator/ci-accelerator

go-test

Failed
“docs: the fleet hub (docs/fleet.md, ADR-0063, ADR-0064), changelog”a65935ca on feat/fleet-hub-prtarget testnode 7ljc8
Failed
The build failed.
process "/bin/sh -c go test ./..." did not complete successfully: exit code: 1
1 min 7 s 6 of 8 steps ran
Job logthe end of it, read from GitLab when you open this

Read from GitLab when you ask, nothing before.

What changed since the previous build

the previous build, pipeline #3068661145 · compare side by side
Commit
db316a00 → a65935ca docs: the fleet hub (docs/fleet.md, ADR-0063, ADR-0064), changelog
Steps run
5, last time 0

Steps

LineStepResultTime
base imagegolang:1.27.3-trixiealready on this node0.0 s
WORKDIR /src from cache 0.0 s
COPY go.mod go.sum ./ built 0.0 s
RUN --mount=type=cache,target=/go/pkg/mod go mod download built 0.2 s
COPY cmd cmd built 0.0 s
COPY internal internal built 0.1 s
COPY docs/api docs/api built 0.0 s
18 RUN --mount=type=cache,target=/go/pkg/mod --mount=type=cache,target=/root/.cache/go-build go test ./... failed 1 min 6 s
Detailsnode, job, context, trace, record
Build node
ci-accelerator-buildkit-7ljc8 (ubuntu-8gb-hel1-2)
Routed by
the build router: the job's own node, ubuntu-8gb-hel1-2, whose cache holds the project's layers
GitLab job
go-test · 18084207687 · 1 min 19 s in all, 1 min 7 s of it building
Before the build
the runner preparing the job's pod 0.8 s · the job's pod starting: scheduled, images pulled 2.0 s · the runner attaching to the pod, the checkout and the job's script up to the build 4.7 s (the pod's times are whole seconds, as Kubernetes records them)
Waited for a runner
4.7 s
Runner
ci-accelerator box (Hetzner, the project's own builds)
Build context sent
9.7 MiB
Started
16 Nov 21:35:41 UTC
Error
process "/bin/sh -c go test ./..." did not complete successfully: exit code: 1
Trace id
019931960000b75783ac000435e71c47
Record
t92it6ggvwrvu9qvw4mzxllx7
API
GET /api/v1/builds?limit=50 (this build is id 223)