ci-accelerator/ci-accelerator
Pipelines/#3075965868

docs: the fleet hub (docs/fleet.md, ADR-0063, ADR-0064), changelog

Failed
feat/fleet-hub-pra65935ca16 Nov 21:35 UTC

All 3 images were rebuilt: 2 because of the change, 1 failed. Ready 1 min 8 s after the first build started.

3 jobs in 1 min 25 swaiting for a runner: usually 4.7 s, longest 5.9 s (go-vet)

Timeline

every job of the pipeline · go-test ended last
Pipeline › job › stage › step70 rows
0:000:200:401:001:201:40
docs: the fleet hub (docs/fleet.md, ADR-0063, ADR-0064), changelog
1 min 25 s · 3 jobs
Runner & checkoutSend contextExport & pushBase imageJob without an image buildWaiting for a runnerBuiltFrom cacheWaiting for another job

Rebuilt

the first rebuilt step and why